NUR699 Nursing Evaluation Plan For EBP Project In 500-750 words (not including the title page and reference page), develop an evaluation plan to be include
NUR699 Nursing Evaluation Plan For EBP Project In 500-750 words (not including the title page and reference page), develop an evaluation plan to be included in your final evidence-based practice project. Provide the following criteria in the evaluation, making sure it is comprehensive and concise:
Describe the rationale for the methods used in collecting the outcome data.
Describe the ways in which the outcome measures evaluate the extent to which the project objectives are achieved.
Describe how the outcomes will be measured and evaluated based on the evidence. Address validity, reliability, and applicability.
Describe strategies to take if outcomes do not provide positive results.
Describe implications for practice and future research.
Prepare this assignment according to the APA guidelines found in the APA Style Guide, located in the Student Success Center. An abstract is not required.
This assignment uses a rubric. Please review the rubric prior to beginning the assignment to become familiar with the expectations for successful completion.
You are required to submit this assignment to LopesWrite. Please refer to the directions in the Student Success Center.
Upon receiving feedback from the instructor, refine “Section G: Evaluation” for your final submission. This will be a continuous process throughout the course for each section. Course Code
NUR-699
Class Code
NUR-699-O500
Criteria
Percentage
Evaluation
100.0%
Develop
an evaluation plan. Describe the
rationale for the methods used in collecting the
outcome data, the ways in which the outcome
measures evaluate the extent to which the
project objectives were achieved, and how the
outcomes will be measured and evaluated based 100.0%
Total Weightage
100%
Evidence-Based Practice Proposal: Section G: Evaluation of Process
Unsatisfactory (0.00%)
Evaluation plan presents the method used in the
measurement of the outcomes but does not align the project
objectives and/or evidence. The rationale is missing.
Modification strategies as well as the impact to future
research may or may not be present with minimal details.
Subject matter is absent, inappropriate, and/or irrelevant.
60.0
Less than Satisfactory (80.00%)
Evaluation plan presents the methods used in the
measurement of the outcomes according to the project
objectives and/or evidence. The rationale is missing. The
information presented is ambiguous. Modification strategies
as well as the impact to future research may or may not be
present with minimal details. A lack of comprehension is
Satisfactory (88.00%)
Evaluation plan presents the rationale for and the methods
used in the measurement of the outcomes according to the
project objectives and evidence. The information presented
may lack cohesiveness and details. Possible project
modifications when outcomes do not provide expected
results are listed. The implications for practice and future
Good (92.00%)
Evaluation plan presents the rationale for and the methods
used in the measurement of the outcomes according to the
project objectives and evidence. Validity, reliability, and
applicability are briefly addressed. Strategies for project
modification when outcomes do not provide expected results
are outlined. Implications for practice and future research are
Excellent (100.00%)
Comments
Evaluation plan presents the rationale and the methods used
in the measurement of the outcomes according to the project
objectives and evidence. The information presented is
aligned, comprehensive, and addresses validity, reliability,
and applicability. The plan formulates clear and precise
strategies for project modification when outcomes do not
Points Earned
Purchase answer to see full
attachment